Redevelopment Project Area means an area designated by the municipality, which is not less in the aggregate than 1 1/2 acres and in respect to which the municipality has made a finding that there exist conditions which cause the area to be classified as an industrial park conservation area or a blighted area or a conservation area, or a combination of both blighted areas and conservation areas.
Redevelopment Area means the community redevelopment area described, defined or otherwise identified or referred to in the Redevelopment Plan.
Project area budget means a multiyear projection of annual or cumulative
Project Year means the twelve-month period beginning from the Effective Date and ending twelve months thereafter (the First Project Year), and any twelve-month period beginning at the end of the First Project Year, or the end of subsequent Project Years;
Project means the goods or Services described in the Signature Document or a Work Order of this Contract.
Project Improvements means site improvements and facilities that are:
generating plant means the generating facility described in Schedule 1 as amended from time to time;
New Project means (a) each facility which is either a new facility, branch or office or an expansion, relocation, remodeling or substantial modernization of an existing facility, branch or office owned by the Borrower or its Subsidiaries which in fact commences operations and (b) each creation (in one or a series of related transactions) of a business unit to the extent such business unit commences operations or each expansion (in one or a series of related transactions) of business into a new market.
Redevelopment project means a specific construction project
Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.
Phase III means human clinical trials, the principal purpose of which is to establish substantial evidence of both safety and efficacy in patients with the disease or condition being studied, as more fully defined in 21 C.F.R. §312.21(c) or similar clinical study in a country other than the United States. Phase III shall also include any other human clinical trial intended to serve as a pivotal trial to support the submission of an application for regulatory approval.
Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;
Project area plan means a written plan that, after its effective date, guides and controls the development within a project area.
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
Project Area means land or lands located within the incentive
Parking Facilities means the parking area located on the Property, containing the approximate number of lined parking spaces set forth in the Building Description, which parking area is provided as Common Facilities.
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.
Project Work means the work required to complete the Project.
Proposed Project SCHEDULE: (edit schedule below as appropriate) Pre-bid Meeting Questions Due Proposals Due Begin Work Programming Phase Permitting Phase Schematic Design Phase Construction Documents Phase Bidding or Negotiation Phase Construction Administration 1-Year Warranty
Commercial plan means a subcontracting plan (including goals) that covers the offeror’s fiscal year and that applies to the entire production of commercial items sold by either the entire company or a portion thereof (e.g., division, plant, or product line).
Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.
Development Area means that area to which a development plan is applicable.
Project Commencement Date means the commencement date notified to the Minister pursuant to clause 4(1);
Tenant Improvements Defined in Exhibit B, if any.
Constructional Plant means all appliances or things whatever nature required in or about the execution, completion or maintenance of the works or temporary works (as hereinafter defined) but does not include materials or other things intended to form or forming part of the permanent work or temporary housing, hutting, office, stores, etc.,